Our Completed Projects
KING ABDULAZIZ NAVAL BASE HANGAR PROJECT
Client: MAPA / BAYKAR
Location: Jubail
Man Power: 110
Completion Date: July 2025
Completion: Completed
Description: Execution of civil works for the Jubail Hangar Project, including structural concrete, foundation, slab, column, and beam works for aircraft hangar and technical support buildings. The scope also covers general site civil activities as per MAPA’s specifications and schedule requirements.
ZULUF WATER TREATMENT PLANT PROJECT
Client: Douglas OHI LLC / Aramco
Location: Safaniyyah
Man Power:152
Completion Date: Feb 2025
Completion: Completed
Description: Civil construction works for the MSS and WTP Buildings. The project involves the use of 7,000 m³ of high-quality concrete. The MSS Building will function as an operational hub, while the WTP Building is crucial for water treatment processes. The construction aims to achieve the highest standards of durability and functionality.
ZULUF ON-SHORE OIL FACILITIES PROJECT
Client: CCC / JGS / Aramco
Location: Safaniyyah
Man Power:150
Completion Date: July 2024
Completion: Completed
Description: Civil construction works for oil facilities. Works included Pipe Racks, Pipe Slippers, Duct Banks, Machine Foundations, Tank Foundations, and Concrete Pavement. The scope included 70,000 m³ of concrete work.
JUBAIL DESALINATION PLANT PHASE II PROJECT
Client: SSEM / SWCC
Location: Jubail
Man Power:120
Completion Date: December 2024
Completion: Completed
Description: Civil and architectural works for RJPH2. Works included General Site Works, RO Building, Admin Building, Electrical Building, Intake Electrical Building, Intake Pump Station, Product Water Storage, Neutralization Tank, and Guard House, totaling 68,400 m². The scope included 25,000 m³ of concrete and 2,654 tons of reinforcing bar work.
Riyas NGL Project
Client: Douglas OHI LLC
Location: Jubail
Man Power: 30
Completion Date:Apr 25
Completion: Completed
Description: Execution of permanent civil works for CCC at ARAMCO’s Fadhili Gas Increment Program (Package 4), including casting of foundations, lean/screed concrete, pipe sleepers, walls, stairs, culverts, duct banks, anchor bolts and pavement works, in compliance with ARAMCO and Main Contractor (Samsung) standards.
Al Kharj Hangar Project
Client: MAPA / BAYKAR
Location: Al Kharj
Man Power:20
Completion Date: Oct 24
Completion: Completed
Description: Execution of perimeter fence installation works for the Al-Kharj Hangar Project, including supply, excavation, concrete base, steel post erection, and all associated civil activities in accordance with MAPA's specifications and project schedule.
Jubail Hangar Project
Client: Jubail
Location: MAPA / BAYKAR
Man Power:40
Completion Date: Sep 24
Completion: Completed
Description:Execution of 2.4 km temporary access road construction and mobilization area fencing works for the Al-Jubail Hangar Project, including supply, grading, subbase, base course, and complete fence installation in line with MAPA’s project specifications and timeline.
Our Ongoing Projects
FADHILI II GAS INCREMENT PROGRAM (PKG#4)
Client: CCC / SAMSUNG / ARAMCO
Location: Jubail
Man Power: 83
Start Date: Apr 2025
Completion: Ongoing
Description: Execution of permanent civil works for CCC at ARAMCO’s Fadhili Gas Increment Program (Package 4), including casting of foundations, lean/screed concrete, pipe sleepers, walls, stairs, culverts, duct banks, anchor bolts and pavement works, in compliance with ARAMCO and Main Contractor (Samsung) standards.
PHOSPHATE 3 PHASE 1 PROJECT
Client: TEKFEN / WORLEY / MA'ADEN
Location: Wa’ad Al Shamal / KSA
Man Power:159
Start Date: Nov 2024
Completion: Ongoing
Description: Execution of general civil works for Ma’aden’s Waad Al Shamal Beneficiation Area under Tekfen, including cast-in-situ foundations, grade slabs, superstructure and precast works, as well as civil works of substation and laboratory buildings, in full compliance with Ma’aden and Tekfen technical specifications and project requirements.
Our Managed Projects
HAWIYAH UNAYZAH GAS RESERVOIR STORAGE PROJECT
Client:Samsung / Aramco
Location: Hawiyah / KSA
Man Power: 110
Completion Date: March 2022
Description: Turnkey earthworks, civil, architectural, and HVAC procurement and installation works. Works included all reinforced civil concrete, road and asphalt paving works for phase 1 process areas. The project comprised 32 building RC, architectural, and HVAC works. The scope included 100,000 m³ of excavation, 500,000 m³ of filling, and 30,000 m³ of concrete work.
DUBA WATER DESALINATION PLANT PROJECT
Client:Metito / SWCC
Location: Duba / KSA
Man Power: 400
Completion Date: March 2020
Description: Turnkey earthworks, civil, architectural, and HVAC procurement and installation works. Works included all reinforced civil concrete, road and asphalt paving works for phase 1 process areas. The project comprised 32 building RC, architectural, and HVAC works. The scope included 100,000 m³ of excavation, 500,000 m³ of filling, and 30,000 m³ of concrete work.
SHUQAIQ SATELLITE DESALINATION PLANT PROJECT
Client:Rawafid / SWCC
Location: Shuqaiq / KSA
Man Power: 200
Completion Date: Dec 2020
Description: Turnkey civil, architectural, and steel structure procurement and installation works. Works included Sea Water Intake & Outfall, Pretreatment Area & Wastewater Area, RO Building, Electrical and Control Building, Post Treatment Area, and Chemical Storage Building. The scope included 56,531 m³ of excavation, 92,370 m³ of filling, and 12,932 m³ of concrete work
KAEC SOLAR WATER DESALINATION PLANTPROJECT
Client: Metito / Emaar
Location: Jeddah / KSA
Man Power: 140
Completion Date: Feb 2022
Description: Turnkey civil and architectural works. Works included General Site Works, Machine Foundations, RO Building, Admin Building, Electrical Building, Intake Electrical Building, Intake Pump Station, Product Water Storage, Neutralization Tank, and Guard House, totaling 68,400 m². The scope included 15,227 m³ of concrete and 1,531 tons of reinforcing bar work
RABIGH II REFINING & PETROCHEMICAL PROJECT
Client:Saipem / Aramco
Location:Rabigh / KSA
Man Power: 80
Completion Date: March 2017
Description: Miscellaneous excavation, backfilling, reinforced concrete, steel, equipment installation, process piping, and instrumentation works. The scope included 10,000 m³ of excavation, 985 m³ of concrete, 12 tons of chequered plate cover, and 12,570 m² of protective coating works
YANBU POWER AND DESALINATION PLANT PROJECT
Client: Samsung Engineering / SWCC
Location: Yanbu / KSA
Man Power: 580
Completion Date: September 2016
Description: Civil works for aeration basin, mixing basin, bypass basin, discharge basin, and buildings. The scope included 350,000 m³ of excavation, 93,000 m³ of concrete, and 10,000 tons of rebar work.
PETRORABIGH II INITIAL START-UP TEAM ACCOMODATION PROJECT
Client:Sumitomo / Baytur / Aramco
Location: Rabigh / KSA
Man Power: 200
Completion Date: March 2017
Description: Construction of camp facilities, including 200 bachelor accommodation units and 48 family residence units. All MEP utilities and infrastructure works are included. The total covered area is 108,000 m². The scope included structural, mechanical, electrical, plumbing works, and landscaping.
PETRORABIGH II NON PROCESS BUILDINGS CONSTRUCTION PROJECT
Client: Sumitomo / Aramco
Location: Rabigh / KSA
Man Power: 800
Completion Date: December 2018
Description: Supply and construction of administration building, product warehouse building, client camp, client offices, additional buildings for maintenance, laboratory, and canteen buildings inside the existing PRB facilities. Renovation of the main mess hall, and operation and maintenance of all facilities. The total scope included 76,000 m².